THE 7 STEPS
The process at a glance
- Define your audience, preferred areas and campaign dates.
- Get a shortlist of available faces with photographs, sizes and facing.
- Compare a written quotation with media, printing, installation and taxes as separate lines.
- Approve a mock-up of your artwork on the real location photograph.
- Confirm the work order and payment schedule.
- Supply final artwork about 72 hours before installation (five days for metro screens).
- Receive installation photographs or the LED log summary as proof.
01 / PREPARE
What to have ready before you call
- Who you want to reach and what you want them to do.
- The areas or routes that matter: near an outlet, a project, a university.
- Your start date and how long you want to run.
- Any existing artwork or brand guidelines.
02 / AFTER YOU BOOK
What happens next
We print, install and send photographs for static boards, or schedule your file and send the log summary for LED screens. If something needs attention during the term, you have one number to call.
QUICK, STRAIGHT ANSWERS
Questions buyers ask before they call
How long does it take to book a billboard in Dhaka?+
Often only a few days from first call to installation, once the site is free and artwork is approved. Peak seasons can take longer, so book early.
What documents do I need to book a billboard?+
Usually just a confirmed work order, the agreed advance payment and approved artwork. We handle site arrangements with the owner.
KEEP EXPLORING
Compare before you commit
THE NEXT MOVE IS YOURS
Your audience. Your area. Your dates.
Three answers are all we need. You get a shortlist of real placements, current availability and a clear quotation, usually the same day.
